Platform and account

What results mean

How far each result goes, and why a completed workflow is not a chip approved for fabrication.

Not a fabrication approval#

A completed workflow is not the same as a chip approved for fabrication

Manufacturing requires qualified, release-matched process data, complete verification and signoff, and foundry-specific submission review. Tapeo does not certify a design or replace the foundry's rules and approval.

The scope of each result#

ResultWhat it does and does not show
Simulation passThe executed testbench reported success for the tested cases; it does not prove all possible behavior correct.
Timing, area, power, temperature, physical metricsOnly available when the corresponding tool flow produces a measurement with suitable inputs. RTL simulation does not measure silicon power, temperature, or physical timing.
DRCOnly as broad as the exact deck and settings used. A reported zero is not a complete foundry DRC pass if the deck is partial.
Extraction and LVSRequire process-specific inputs and a valid reference netlist. Missing prerequisites remain blockers.
Engineering handoff archiveUseful for review and continued engineering work, but not automatically a foundry-qualified tapeout package.